Test Strategy Planner

Plan risk-based testing for a feature or epic.

8 inputs2 required

Overview

Turn an epic or a set of feature tickets into a risk-based test strategy, what to test, how deeply, in what order and by when, written the way a senior QA lead would, then hand each prioritised area straight to the Test Case Writer.

What it does

  • Reads one or more epics / stories from your connected tracker
  • Scores every test area on likelihood × impact into P1–P4
  • Sizes the schedule to your release date and team capacity
  • One click per area to generate its test cases

What you get

  • Scope in / out, with the cost of what's left out
  • Approach per level: functional, API, UI, accessibility, security, performance, regression
  • A filled risk matrix and heat map with rationale
  • Entry / exit criteria, environments & data, schedule, deliverables and risks

What you provide

Feature / epic ticketsOptional

Pick one or more epics or stories. With a connected tracker the planner reads them; otherwise describe the feature below.

Scope notesRequired

Paste the epic summary or requirements if the tickets can't be read.

Known risk areasOptional

e.g. new payment gateway, data migration of 2M orders, last release's checkout outage

Release dateOptional

The schedule is planned backwards from this date.

Team capacityOptional

e.g. 2 QA engineers × 3 weeks, 1 SDET at 50%

EnvironmentsOptional

e.g. QA (nightly build, mocked payments), staging (prod-like, Stripe sandbox), Chrome/Safari, iOS 17+

Test levels in scopeRequired

All are selected by default, deselect the levels this strategy shouldn't plan.

Your rules / custom guidelinesOptional

e.g. priorities P0–P3 · exit criteria require 95% pass rate · WCAG 2.1 AA · no testing on production · TestRail for cases

Reach for it when

Kicking off a release with a plan the whole team agrees on.